A 2019 proposal tested how an underused site beside rail and highway infrastructure could reconnect to Castleberry Hill through adaptive reuse, new public links, and a mixed-use development framework.

2019 aerial showing the proposed Downtown Gateway site on Whitehall Street
The study site sat between Castleberry Hill, rail lines, highway connections, and downtown Atlanta.Downtown Gateway report

Project record

Location
Whitehall Street at Ted Turner Drive / Atlanta, Georgia
Site in 2019 report
9.86 acres with three existing buildings
Study scope
Master plan, reuse strategy, development budget, and financial sensitivity tests
Status
2019 proposal; unbuilt

Project context

The project in context.

Downtown Gateway studied a South Downtown Atlanta parcel bordered by rail, highway, and street infrastructure. Despite its location, those edges made access and connection to Castleberry Hill difficult, while existing buildings called for a response more careful than clearing the site.

The 2019 proposal paired site and building research with a first master-plan sketch, possible adaptive reuse, new public links, and a development feasibility model. The figures and drawings reflect the assumptions of the 2019 proposal.

01 / Challenge

A large site cut off from its neighbors.

The Whitehall Street parcel offered scale and a downtown location, but rail, highway, and street edges weakened its connection to Castleberry Hill and nearby transit. Three existing buildings also made a simple clear-site plan the wrong starting point.

The proposal asked whether access, reuse, new construction, and a credible development sequence could be treated as one problem rather than separate drawings.

02 / Contribution

A proposal connecting place and feasibility.

Battistoni and Davis assembled a site reading, building-stock survey, historic street study, zoning and market research, an early master-plan concept, and a modeled development budget. The drawings explored renewed links toward Castleberry Hill and a mix of residential, commercial, and public uses.

The report tested one scenario of 600 apartments and 80,000 square feet of commercial space. Those figures were assumptions for the 2019 feasibility model.

How the work moved

Connected workstreams, one project story.

01

Read the site

Mapped the parcel against rail, highways, MARTA, and surrounding neighborhoods to identify the access problem.

02

Find the connections

Used the historic street grid to study where links across the rail edge might restore movement toward Castleberry Hill.

03

Work with what exists

Surveyed three buildings and proposed retaining two within a broader redevelopment concept.

04

Test the proposition

Paired the spatial concept with a 2019 development budget, pro forma, and sensitivity analysis rather than treating the plan as image alone.

Project evidence

The proposal, from site to plan.

Rotated original master-plan sketch showing proposed blocks, green space, links, and building program
The master-plan sketch brings new blocks, open space, adaptive reuse, and movement into one early framework. View full size ↗Battistoni and Davis, 2019 report
Historic cadastral map marking former street connections near the Atlanta site
A historic cadastral map informed the study of former street links across the rail edge. View full size ↗Downtown Gateway report
Survey sheet showing the three existing buildings reviewed in the 2019 proposal
The existing-building survey grounded the reuse strategy in the site’s actual building stock. View full size ↗Downtown Gateway report

Proposal outcome

A complete development proposition.

The 2019 report connected site and building research to an early master plan and a financial test. It gave the team a way to discuss spatial ambition and development constraints together.

The proposal remains a 2019 study. Market, ownership, zoning, and cost information reflect conditions at that time and would need to be updated for any current use.

Related services

Project inquiry